Client
Diavik
Project
Power Plant Housing Build
Location
Lac Le Gras, NWT
Category
Heavy Industrial & Mining
Power Plant Housing Build
Design-build of a 46' high, 22,655 sq. ft. building to house the power plant for the facility. The scope included the foundations, supply and installation of the pre-engineered building, the design and supply of the interior fit-out, materials including steel stud, drywall, paint and interior finishes.to house the Finning Power System at the Diavik Mine. The project was designed, procured and packaged to be ready for ice road transport.