Client
Direct Energy
Project
Admin & Control Building
Location
Cochrane, Alberta
Category
Light Industrial
Project Overview
Administration & Control Building
Construction of an 11,000 SF conventional steel administration and control building, integrating a control room and equipped with a Novec fire suppression system. Designed for operational efficiency and safety, the facility supports critical functions with advanced fire protection technology.